Quick answer
BMS schedules tell heating, ventilation and cooling plant when to run. Over time they drift away from how a building is actually used, after tenancy changes, new working patterns or temporary overrides that were never removed. Reviewing schedules against real occupancy, with the connected equipment checked too, can improve comfort and avoid plant running when nobody needs it.
How schedules drift
When a building is commissioned, its schedules reflect the expected occupancy. Then things change: a floor is re-let, a tenant starts early, cleaning shifts move, or hybrid working thins out certain days. Someone adds an override to solve a complaint, and it stays in place long after the reason has gone. The result is plant that runs longer than needed in some areas and not long enough in others.
Signs your schedules need a review
- Heating or ventilation running at night or weekends with the building empty
- Morning complaints that spaces are cold on arrival
- Different floors with different occupancy but identical schedules
- A long list of manual overrides or “hand” settings on the BMS
- Energy use that has not changed even though occupancy has
A practical review
- List how each area is really used, including early starts, late finishes, cleaning and security patrols.
- Compare with current schedules for heating, ventilation and cooling in each zone.
- Find overrides and confirm whether each is still needed.
- Check optimum start settings, which let plant start earlier on cold mornings and later on mild ones.
- Confirm the equipment responds: valves and dampers actually move, and pumps and fans start and stop as scheduled.
That last step matters. A schedule change will not fix a stuck valve or a failed actuator, and changing settings without checking the connected equipment can hide a mechanical fault.
Only trained and authorised people should change BMS settings. Record what was changed, when and why.
Working with your engineer
A schedule review fits well into a planned maintenance visit or a controls review. Share your occupancy information, any recurring comfort complaints and a list of current overrides. See BMS & building controls for how controls and mechanical equipment are investigated together.
Questions
How often should BMS schedules be reviewed?
Whenever occupancy changes significantly, at seasonal changeovers, and as part of routine maintenance reviews. Temporary overrides should be logged and removed when no longer needed.
Will shortening plant run times always save energy?
Not always. Plant that starts too late may run harder to catch up, and some spaces need ventilation outside core hours. Changes should be made by someone who understands the systems.
General guidance only. It does not replace a qualified site-specific assessment. For gas escapes or carbon monoxide, call the National Gas Emergency Service on 0800 111 999.